I finally figured out how the city's proposed Whyte Ave Bus rapid transit design...

@AmeliasBrain@mstdn.ca

I finally figured out how the city's proposed Whyte Ave Bus rapid transit design relates to the "transit priority plan" work announced this spring. I'd thought the two conflicted, because the BRT plan talks about using a dedicated curbside bus lane, but the current work involves bumping sidewalks out into the curbside (parking/patio) lane. Then I paid attention to how many lanes total are in the BRT proposal. This year's bump-outs would be the new curb. The bus lanes would take away from current driving lanes.

Current configuration (see satellite view):
7-lane road where center lane is left turns, outer lanes are a mix of parking, patios/sidewalk-detours, bus stops, & right turns. Two driving lanes in each direction, which should be enough for a pedestrian-focused commercial street if it wasn't also the only continuous East-West corridor between the river & 63 Ave. Often backed up & emergency vehicles get caught in it. Scramble crosswalks help pedestrian crossings with lots of turning traffic.

#YEG 1/3