Workbench, pondering stuff

@Dangerous_beans@aus.social

Content warning: Workbench, pondering stuff

I think the better way to do this would be to prep the outside beams with straight and square surfaces, do the leg joints into them as dovetailed half-lap joint, and glue the parts into two sub assemblies (beam 1+2 with the 2 legs on that side, the other is beams 3+4 and legs). Then prep the inside joint and glue it up

The problem with this in my specific situation is you need equipment and space for prepping 2m stock. Jointer and table saw, or appropriate planes, and somewhere to do that. I don't have that, I've been doing this with hand saws, a mitre saw, and a number 4 plane
I have work space, but I'm doing this so it's better set up for this sort of work

I think what I did works better given the improvised work space I have