Boring "A 1,764-ton tunnel borer was taken apart after a 1.2-mile dig, hauled ac...
JaZone @JaZone@universeodon.com
Boring
"A 1,764-ton tunnel borer was taken apart after a 1.2-mile dig, hauled across an Italian river on a temporary steel bridge and rebuilt on the far side, where its 41-foot cutting head has started a second tunnel with 18 motors supplying 6.3 megawatts."
#Italy
https://www.autonocion.com/us/tunnel-borer-dismantled-ufita-river-bridge/