Change control? We have to produce construction drawings through a CAD departmen...

@Secure_ICS_OT@infosec.exchange

Change control?

We have to produce construction drawings through a CAD department and someone with a signing authority needs to review and sign and stamp them before things change.

Production is documented in actual controlled drawings, not some fucking random uncontrolled word or visio drawing.