I worked at Ontario Hydro for a while, right when it was becoming not "Ontario H...
ZenHeathen 🇨🇦 @ZenHeathen@beige.party
I worked at Ontario Hydro for a while, right when it was becoming not "Ontario Hydro" anymore. The communication systems network all over the province which reported back to the main control centre had redundancies. Every section of the network reported back via two *completely different* systems. If one was via phone lines, the other *could not be* via phone lines, nor even data via phone lines. Microwave transmission towers, copper vs fibre, etc etc. Every section had two routes, of completely different tech, preferably not even traveling the same route. It was a pretty good system.
A generation later, we've got municipalities, hospitals, utilities, banks, running everything through one or another cloud service with no separate system available for when that goes down.
What's the matter, are we stupid!??!