“AI datacenters” have absolutely mindboggling power requirements, and I say that...
Tony “Abolish ICE” Arcieri🌹🦀 @bascule@mas.to
“AI datacenters” have absolutely mindboggling power requirements, and I say that as someone who has operated a handful of cabinets across multiple sites over the past decade. Each cabinet I operate draws approximately 1-5kW.
It seems the modern trend for AI datacenters is towards 1MW(!) cabinets, or enough to power around 500 homes.
There seem to be a couple ways to achieve this: dual 480V 100A three phase AC circuits delivered directly to each cabinet, or separating AC/DC conversion into its own cabinets, and delivering 400V or 800V DC directly to the cabinets.
https://flex.com/resources/grid-to-chip-delivering-power-for-megawatt-scale-racks-in-ai-data-centers