In the small hours of June 30, Joe Klima lay awake in bed. A little before 5 a.m...

@cdarwin@c.im

In the small hours of June 30,
Joe Klima lay awake in bed.

A little before 5 a.m., he rose and packed his lunch.

Ahead of Klima was his last shift at the Conn Selmer plant in Eastlake, Ohio
— everyone’s last shift,
because the factory was closing.

At a time when the president of the United States said the country was in the midst of a manufacturing renaissance,
the 150 people who still worked at the plant were losing their jobs,
and seeing many of them offshored to China
washingtonpost.com/politics/20