@ohtheurbanity.bsky.social metrolinx has plans to reduce the tracks at Union and...

@jfmezei@cosocial.ca

@ohtheurbanity.bsky.social metrolinx has plans to reduce the tracks at Union and electrify. But there are challenges due to low height of historic train shed apparently. (yet there wasn't a problem electrifying Central station in Montréal when built, and when re-electrified in 1995 with 25kv AC. )

Metrolinx is onwer from Durham Jct to Union station so Alto will have to negotiate for rights and might be asked to contribute to costs of 3rd track between Durham jct and Guildwood.