EN Revision Imported Date: 7/10/2026 EN Revision Text: HIGH PRESSURE COOLANT INJ...

@whoopsie@tds.xyz

EN Revision Imported Date: 7/10/2026

EN Revision Text: HIGH PRESSURE COOLANT INJECTION INOPERABLE
Browns Ferry (AL), 01/18/2026
"At 1445 CST on 1/18/2026, Browns Ferry Unit 1 high pressure coolant injection (HPCI) was declared inoperable due to 1-FCV-073-0006A, [HPCI steam line condensate inboard drain valve], and 1-FCV-073-0006B, [HCPI steam line condensate inboard drain valve], being found closed.

"This condition is being reported as an 8-hou…
nrc.gov/reading-rm/doc-collect