PLANT SHUTDOWN REQUIRED BY TECHNICAL SPECIFICATIONS Millstone (CT), 11/24/2026 "...
NRC Event Notification Reports @whoopsie@tds.xyz
PLANT SHUTDOWN REQUIRED BY TECHNICAL SPECIFICATIONS
Millstone (CT), 11/24/2026
"At 0507 EST on November 24, 2026, Millstone Unit 3 commenced a reactor shutdown and cooldown to mode 4 to comply with technical specification limiting condition for operation (LCO) 3.5.2 'emergency core cooling systems' for subsystems greater than 350 degrees Fahrenheit.
"The 'B' residual heat removal pump could not be restored within the 72 hours allowed LCO time requiring a technical spe…
https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2026/20261125en.html#en58548